
| Policy | |||||||
| Green Remodel Checklist | Suggested Alternative | ||||||
| A. Site | |||||||
| 1. Recycle Job Site Construction & Demolition Waste | |||||||
| 2. Salvage Reusable Materials | |||||||
| B. Foundation | |||||||
| 1. Incorporate Recycled Flyash in Concrete with Engineer's Approval | |||||||
| 2. Reuse Form Boards | |||||||
| 3. Use Recycled Content Rubble for Backfull Drainage | |||||||
| C. Structural Frame | |||||||
| 1. Substitute Solid Sawn Lumber with Engineered Lumber with Architect and Engineer Approval | |||||||
| 2. Use FSC Certified Wood for Framing | |||||||
| 3. Use Wood I-Joists for Floors and Ceilings with Engineer's Approval | |||||||
| 4. Use OSB for Subfloor and Sheathing if Dry | |||||||
| 5. Use Finger-Jointed Studs | |||||||
| 6. Use Reclaimed Lumber | |||||||
| D. Exterior Finish | |||||||
| 1. Use Sustainable Decking Materials | |||||||
| 2. Use Treated Wood that does not Contain Chromium or Arsenic for Decking and Sill Plates | |||||||
| 3. Use Alternative Siding Materials | |||||||
| E. Plumbing | |||||||
| 1. Install Hot Water Jacket Insulation | |||||||
| 2. Insulate Hot and Cold Water Pipes | |||||||
| F. Electrical | |||||||
| 1. Install Compact Florescent Light Bulbs | |||||||
| G. Roofing | |||||||
| 1. Install 40 Year Composition Roofing | |||||||
| H. Insulation | |||||||
| 1. Upgrade Wall and Ceiling Insulation to Exceed Title 24 Requirements | |||||||
| 2. Install Recycled Content Fiberglass Insulation | |||||||
| 3. Use Cellulose Insulation | |||||||
| 4. Install Recycled Cotton Insulation | |||||||
| I. Windows | |||||||
| 1. Install Energy Efficient Windows | |||||||
| 2. Install Reflective Film on West Windows | |||||||
| J. Heating, Ventilation and Air Conditioning (HVAC) | |||||||
| 1. Vent Range Hood to the Outside | |||||||
| 2. Clean all Ducts Before Occupancy | |||||||
| 3.
Install 90% or Greater Efficiency Gas Forced Air Furnace
|
|||||||
| 4. Install Zoned, Hydronic, Radiant Heating | |||||||
| 5. Install Separate Garage Exhaust Fan | |||||||
| K. Renewable and Solar Energy | |||||||
| 1. Install Photovoltaic (PV) Panels | |||||||
| L. Indoor Air Quality/Finishes | |||||||
| 1.
Use Low/No VOC and Formaldehyde-Free Paint
|
|||||||
| 2. Substitute Particleboard with Formaldehyde-Free Materials | |||||||
| 3. Substitute Formaldehyde-Based Medium Density Fiberboard (MDF) with Formaldehyde-Free Materials | |||||||
| 4. Use FSC Certified Trim Material | |||||||
| 5. Use Finger-Jointed Trim | |||||||
| M. Flooring | |||||||
| 1. Select FSC Certified Wood Flooring | |||||||
| 2. Use Rapidly Renewable Flooring Materials | |||||||
| 3. Replace Vinyl Flooring with Natural Linoleum | |||||||
| 4. Install Recycled Content Carpet and Underlayment | |||||||
| 5. Use exposed concrete as finish floor | |||||||
Home - Mission Statement - Contact Us - Build Green - Green Checklist - News & Events
- Links - 'Green' Projects - 'Green' Model Home - Customer Reviews - About Us